After-sales Service: | Technical Support |
---|---|
Warranty: | 1 Year |
Certification: | CE |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Steel frame C U purlin cold bending forming machine is composed of hydraulic shear head, roll forming system, electrical system, etc.
The Steel frame C U purlin cold bending forming machine has the following characteristics:
1. Advanced technology: the line adopts continuous coil production after cold bending to determine the precision of the long cutting parts forming shape rules length accurate consistency.Good appearance and high strength of molding workpiece.
Weight | About 2500kg |
Size | About 8m x 1.2m x 1.3m (length x width x height) |
Thickness | 1.0-2.0mm |
Power | 11kw |
Production Capacity | 10-20m/min |
|
|
---|---|
Voltage | 380V/50HZ 3 Phase(as Customer's Request) |
Forming rollers material | 45# steel with CNC machining and surface is being hard chrome |
Cutter material | CR12 mould steel, with quenched treatment |
Controlling system | DELTA PLC and Converter |
Hydraulic unit motor power | Main motor power: 5.5kw |
5.kw |
More machine pictures
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
The Delivery Time: 30 working days after the down payment is received.