9. Suitable material to process |
Material: pre-painted steel sheet, galvanized steel sheet, galvalume steel sheet; |
Max. thickness: 1mm; |
Max. length: 6000mm. |
10. Technique parameters of the main roll forming machine |
(1). Oil cylider: Φ125mm*3PCS; |
(2). Depth: 350mm; |
(3). Lower die size: 60mm*60mm; |
(4). Material of the die: #60 steel; |
(5). Temper: 550mpa; |
(6). Weight: about 2 tons; |
(7). Hydraulic station power: 3kw; |
(8). Hydraulic tanker oil: 30kg; |
(9). The width of steel sheets: min 5cm. |
1. Guarantee
In correct operation and maintenance, the machines are 12 months quality guarantee from time of loading, life guarantee repair; within quality guarantee period, except for failures caused by human error, spare parts will be provided freely; after the quality guarantee period, only charge the cost of the spare parts. Free technical supporting and maintenance consulting in lifetime.
2. Installation
If necessary, we can send one technician to your factory to install the machine; you need assist our technician to get the visa and pay for the two-way flight tickets, local accommodation (at least three-star hotel with air condition), food, visa cost. And you need pay 200USD/day for technician extra. The total time will be caculated as per the time that shown on the fright tickets when our technician leaves China and arrives back to China.