10. Suitable material to process |
Material: pre-painted steel coil, galvanized steel coil, galvalume steel coil; |
Thickness: 0.5mm - 1.5mm; |
Width: 1200mm. |
11. Technique parameters of the main roll forming machine |
(1). Forming stations: 26; |
(2). Roller material: 45# steel with CNC machining and surface is being hard chrome; |
(3). Diameter of shaft: ¢90mm solid forged 45 #steel, quenching process; |
(4). Material of shaft: solid 45# steel with grinding process; |
(5). Frame of the machine: welded with 400H section steel; |
(6). Wall panel thickness: 20mm; |
(7). Forming motor power: 2 * 11KW; |
(8). Hydraulic station motor power: 5.5KW; |
(9). Control system: PLC brand is DELTA from Taiwan; |
(10). Material of cutting blade: Cr12MoV with hard treatment, HRC52-68; |
(11). Driving mode: single chain 2 inch; |
(12). Forming speed: 0-15m/min; |
(13). Power supply: 380V, 50HZ, 3 PHASES; |
1. Guarantee
In correct operation and maintenance, the machines are 12 months quality guarantee from time of loading, life guarantee repair; within quality guarantee period, except for failures caused by human error, spare parts will be provided freely; after the quality guarantee period, only charge the cost of the spare parts. Free technical supporting and maintenance consulting in lifetime.
2. Installation
If necessary, we can send one technician to your factory to install the machine; you need assist our technician to get the visa and pay for the two-way flight tickets, local accommodation (at least three-star hotel with air condition), food, visa cost. And you need pay 200USD/day for technician extra. The total time will be caculated as per the time that shown on the fright tickets when our technician leaves China and arrives back to China.