1. Suitable material to process |
Material: pre-painted steel coil, galvanized steel coil, galvalume steel coil; |
Thickness: 0.3mm - 0.8mm; |
Width: 1000mm. |
11. Technique parameters of the main roll forming machine |
(1). Forming stations: 9; |
(2). Roller material: 45# steel with CNC machining and surface is being hard chrome; |
(3). Diameter of shaft: ¢70mm solid forged 45 #steel, quenching process; |
(4). Material of shaft: solid 45# steel with grinding process; |
(5). Frame of the machine: welded with 350H section steel; |
(6). Wall panel thickness: 16mm; |
(7). Forming motor power: 3KW; |
(8). Hydraulic station motor power: 3KW; |
(9). Control system: PLC brand is DELTA from Taiwan; |
(10). Material of cutting blade: Cr12MoV with hard treatment, HRC52-68; |
(11). Driving mode: single chain 1 inch; |
(12). Forming speed: 0-3m/min; |
(13). Power supply: 380V, 50HZ, 3 PHASES; |
(14). Dimensions of forming machine: 4500mm*1300mm*1200mm (approximate). |
Guarantee:In correct operation and maintenance, the machines are 12 months quality guarantee from time of loading, life guarantee repair; within quality guarantee period, except for failures caused by human error, spare parts will be provided freely; after the quality guarantee period, only charge the cost of the spare parts. Free technical supporting and maintenance consulting in lifetime.
Installation:If necessary, we can send one technician to your factory to install the machine; you need assist our technician to get the visa and pay for the two-way flight tickets, local accommodation (at least three-star hotel with air condition), food, visa cost. And you need pay 120USD/day for technician extra. The total time will be caculated as per the time that shown on the fright tickets when our technician leaves China and arrives back to China.