Raw material thickness: 0.14-0.3mm; |
Raw material width: 750mm-1200mm; |
Raw material hardness: G550 full hard; |
The total thickness of each time cannot more than 0.6mm; |
Production speed: 10-15 pieces per min.; |
Production capability: 2-4 tons per hour; |
Freeding material automatically; |
Roller station: 2 stations; |
Plate fixed roller shaft diameter: Φ340mm; |
Roll forming roller shaft diameter: Φ380mm; |
Material of roller: 45# steel finish machining; |
Material of main shaft: 45# steel with grinding process and then slack quench processed; |
Frame of the machine: welded with 100mm thickness steel plate. |
Driving mode: gear and chain; |
Power supply: 380V, 50HZ, 3 PHASES. |
1. Guarantee
In correct operation and maintenance, the machines are 12 months quality guarantee from time of loading, life guarantee repair; within quality guarantee period, except for failures caused by human error, spare parts will be provided freely; after the quality guarantee period, only charge the cost of the spare parts. Free technical supporting and maintenance consulting in lifetime.
2. Installation
If necessary, we can send one technician to your factory to install the machine; you need assist our technician to get the visa and pay for the two-way flight tickets, local accommodation (at least three-star hotel with air condition), food, visa cost. And you need pay 200USD/day for technician extra. The total time will be caculated as per the time that shown on the fright tickets when our technician leaves China and arrives back to China.