• 80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line
  • 80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line
  • 80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line
  • 80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line

80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line

After-sales Service: Technical Support
Warranty: 1 Year
Certification: CE
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line pictures & photos
80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line
US $12,800-13,500 / Set
Min. Order: 1 Set
Diamond Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Trading Company
  • Overview
  • Product Description
  • Profile Drawing
  • Detailed Parameters
  • FAQ
Overview

Basic Info.

Model NO.
Purlin
Customized
Customized
Condition
New
Automatic Grade
Automatic
Thickness
1.0-2.0mm
Roller Materials
45#Steel
Working Speed
10-20m/Min
Hydraulic Station Pressure
12.0 MPa
Transport Package
Naked with Plastic Film.
Trademark
FMS
Origin
China
HS Code
84552210
Production Capacity
20pieces/Month

Packaging & Delivery

Package Size
650.00cm * 80.00cm * 120.00cm
Package Gross Weight
3000.000kg

Product Description

 

Product Description

80-300 metal channel steel profile c purlin roll forming machine production line

  The 80-300 metal channel steel profile c purlin roll forming machine production line is composed of hydraulic shear head, roll forming system, electrical system, etc.
The 
Steel frame C U purlin cold bending forming machine has the following characteristics:

  1. Advanced technology: the line adopts continuous coil production after cold bending to determine the precision of the long cutting parts forming shape rules length accurate consistency.Good appearance and high strength of molding workpiece.

  2. High productivity: this line only needs 2-3 people to operate, with simple operation and low labor intensity. The production
speed of this line is adjustable from 10 to 15 meters per minute, and the normal operation speed is 8 to 15 meters per minute.
  3. High reliability: the main components of the hydraulic, pneumatic and electrical systems of this line all adopt imported
high-quality components with stable performance and high reliability materials applicable to high technical parameters.

 

Profile Drawing

 

80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line
80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line
80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line

Detailed Parameters

 

Weight About 2500kg
Size About 8m x 1.2m x 1.3m (length x width x height)
Thickness 1.0-2.0mm
Power 11kw
Production Capacity 10-20m/min
 
Voltage 380V/50HZ 3 Phase(as Customer's Request)
Forming rollers material 45# steel with CNC machining and surface is being hard chrome
Cutter material CR12 mould steel, with quenched treatment
Controlling system DELTA PLC and Converter
Hydraulic unit motor power Main motor power: 5.5kw
5.kw

 

More machine pictures

80-300 Metal Channel Steel Profile C Purlin Roll Forming Machine Production Line

 

FAQ

Guarantee

1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

 

Payment terms

40% in advance as down payment

60% is paid before the shipment is processed

 

Delivery

The Delivery Time: 30 working days after the down payment is received.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now